返回首页

保定自动卷帘机厂

本站导航

新闻动态

当前位置:网站首页 > 新闻动态 > 详细信息
大棚卷帘机的自动性减少了人工卷帘的危险
添加时间:2018/12/27 13:51:44     浏览次数:
大棚卷帘机相信大家都了解,很多大棚的种植户都能够用的到,其性能满足了大多数大棚种植户的需求,节省了劳动力,也减少了人工卷帘的危险,让大棚种植不在辛苦。了解一下大棚卷帘机的安装和使用教程,希望对您有所帮助。
It is believed that everyone knows that many greenhouse growers can use it. Its performance meets the needs of most greenhouse growers, saves labor and reduces the danger of artificial curtain rolling, so that greenhouse planting is not hard. Understand the installation and use of curtain rolling machine in greenhouse, hope to help you.
1.放绳:在已铺好膜的温棚边墙为起点,将拉绳一端固定在后墙上,由上至下沿棚面放至地面,向另一边按间隔1米或1.5米等距离放绳,放绳方法同上,各绳之间保持平行。
1. Laying rope: At the beginning of the side wall of the greenhouse, one end of the pulling rope is fixed on the back wall, and the rope is laid on the ground from top to bottom along the greenhouse surface. The rope is laid on the other side at an equal distance of 1 meter or 1.5 meters. The method of laying rope is the same as above, and the ropes are kept parallel.
2.立杆和顶杆的安装:偏置式大棚卷帘机在温棚一端的边墙前端约1.5—2米的地面上挖一长约2米(与温室长度方向平行)、宽约0.3米、深约0.3米的土坑,将地桩埋入此坑内并打紧压实(地面只留铰合接头),然后将悬臂和立杆用销轴连接好。立杆通过销轴一端与地桩铰接,另一端与悬臂铰接,悬臂的另一端与大棚卷帘机焊接。
2. Installation of vertical pole and top pole: Biased greenhouse curtain rolling machine digs a pit about 2 meters long (parallel to the length direction of greenhouse), 0.3 meters wide and 0.3 meters deep on the ground of the front side wall of one end of the greenhouse. The ground pile is buried in the pit and compacted (the ground only retains articulated joints). Then the cantilever and the vertical pole are connected with pins. The vertical pole is articulated with the ground pile at one end of the pin shaft, and the other end is articulated with the cantilever. The other end of the cantilever is welded with the curtain rolling machine of the greenhouse.
3.大棚卷帘机的安装:将大棚卷帘机放置在前端地面上,在大棚卷帘机一端沿温室长度方向安装相应规格的卷帘杆,卷帘轴材料为国标焊接或法兰连接。卷帘杆一端通过法兰用螺栓连接大棚卷帘机,另一端与其他卷帘杆依次连接。
3. Installation of curtain rolling machine for greenhouse: Place the curtain rolling machine on the front ground, install the corresponding specifications of curtain rods along the length direction of greenhouse at one end of the curtain rolling machine, and the material of curtain shaft is welded or flanged by the national standard. One end of the curtain roll rod is bolted to the greenhouse curtain roll machine through the flange, and the other end is connected with other curtain roll rods in turn.
4.铺设保温帘:从大棚卷帘机处的第一道绳上面,从上到下对称放置一保温帘,并以此向温室另一边逐步铺设,保温帘之间有0.2米左右的搭茬,以便保温。保温帘全部放好后,将其整理整齐,然后在卷帘杆上绕一圈,并用卡毂固定在卷帘杆上。
4. Laying thermal insulation curtain: from the first rope at the curtain rolling machine of the greenhouse, a thermal insulation curtain is placed symmetrically from top to bottom, and gradually laid to the other side of the greenhouse. There is a stubble of about 0.2 meters between the thermal insulation curtain, so as to keep warm. After all the insulation curtains are put in place, they are tidied up, and then circled on the curtain roll rod, and fixed on the curtain roll rod with a clamp hub.
5.连接倒顺开关及电源:倒顺开关应安装在边墙上面。
5. Connect the reverse switch and power supply: The reverse switch should be installed on the side wall.
6.试机:打开倒顺开关,大棚卷帘机运行,若卷起或下铺过程中卷帘杆产生整体弯曲,可在位置较低处垫以适量软物,以调节卷速,直至卷帘杆保持整体水平。
6. Test machine: Turn on the reverse switch and the curtain rolling machine runs in the greenhouse. If the curtain rod bends integrally in the course of rolling up or laying down, the curtain rod can be padded at a lower position with appropriate amount of soft material to adjust the rolling speed until the curtain rod keeps the overall level.
上一页  分析大棚卷帘机为什么跑偏?  
下一页  大棚卷帘机注意事项
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3